Shenzhen ZYH Hardware and Plastic Products Co., Ltd. +86 189 2939 4378 nickcopy698@gmail.com

Oct 2, 2026 · BLOG

Before every shift

Check water flow and temperature on core and cavity, confirm the ejector plate returns fully, and inspect the parting line for flash or crushed material that will damage the steel.

Weekly

Grease guide pins and slideways, check hot-runner tip condition and heater resistance, and clean vents — blocked vents cause burn marks and short shots that are often mistaken for a process problem.

Monthly and yearly

Measure guide-pin clearance, inspect lifting and sliders for wear, and have the mould professionally serviced. We provide free maintenance parts within five years and can supply replacement inserts.

← Back to Mold Knowledge